New TopShim run:

version = topshim 2.0.0
date = 2024-05-04
time = 05:40:58.801
command = topshim  convcomp tuneaxyz

1D SHIMMING

Parameters:

maximum order = 5
probe = Z116098_0395
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 1H
o1p (from lock) = 7.24 ppm
optimisation parameters = ls
linewidth 1H = 0.10 Hz
envelope shape / strictness = 2.00 / 200

Results:

tune lock level increase = 1.5

initial B0 stdDev = 0.96 Hz
sample size = 2.63 cm, position = 0.10 cm
final B0 stdDev = 0.96 Hz > improvement = 1.0
envelope width = 2.59 Hz

Performing tune after shimming
tune lock level increase = 1.2

shim changes: 
Z	-45
X	-43
Y	+147

duration = 3 min 29 sec
completed successfully
finished Sat May  4 05:44:26 2024


========================================================================